Description
H steel structure adopts H section steel for the main frame. It takes less time in erection. The beam and column are prefabricated in the production line. The structure pieces are light in weight, when the foundation work is ready, the erection can be started. Due to bolt connection between structures, the installation can be much faster at working site. Meanwhile, this structure can be available for welding, and the welded joint won’t be torn in the future. H steel structure can be assembled and disassembled quickly. Comparing with concrete building, the erection can take half the time of the same size concrete building and the cost can be saved from 20% to 30%. When disassembling the building, almost all the structure can be reused in a new job. Because of high strength of the steel structure, it has good performance in elasticity. The structure component is small and light, when bearing the same outer force, the structure itself is light and can be extended for big span, while it will take a small volume when packaging and delivering. Due to the plasticity and toughness, the structure can resist strong force and motive load, so it is suitable to use in the area with extreme conditions.Photos


